House Renovation & Extension Services in Nepal

Transform Your Existing Home — Add Space, Modernize, or Complete Makeover

Already have a house in Nepal that needs upgrading? Whether it’s adding a floor, renovating rooms, or doing a complete interior makeover, GharNaksa manages the entire renovation process with the same care and transparency as a new build.

Get Renovation Consultation →


What Renovation Services We Offer

🏠 Floor Additions

  • Add 1-2 stories to existing home
  • Structural reinforcement
  • Foundation analysis
  • New layout design
  • Permit handling

🛁 Room Renovations

  • Kitchen modernization
  • Bathroom upgrade
  • Bedroom makeover
  • Living room renovation
  • Home office addition

🎨 Complete Interior Makeover

  • Full interior redesign
  • New flooring throughout
  • Repainting entire home
  • New fixtures and fittings
  • Modern lighting

🏗️ Structural Renovations

  • Wall removal/addition
  • Open floor plan creation
  • Foundation strengthening
  • Roof repairs
  • Plumbing/electrical updates

🌿 Outdoor Renovations

  • Garden landscaping
  • Boundary wall repair
  • Driveway construction
  • Outdoor kitchens
  • Patio additions

Why Renovate Your Existing Home?

Save Money – 30-50% cheaper than new construction ✅ Keep Memories – Maintain family history in same location ✅ Better Location – Don’t lose your current neighborhood ✅ Less Time – 2-4 months vs. 12+ months for new build ✅ Permits Easier – Renovation often easier to approve ✅ Modern Features – Add what new homes have


Our Renovation Process

Phase 1: Assessment (Week 1)

We start with a thorough property inspection:

  • Structural integrity check
  • Plumbing condition
  • Electrical system
  • Roof condition
  • Foundation status
  • Code compliance issues

We provide a detailed report with:

  • Current home condition
  • Recommended improvements
  • Renovation feasibility
  • Cost estimates

Phase 2: Planning & Design (Week 2-4)

  • Design renovation plans
  • Get architectural drawings
  • Apply for permits (if needed)
  • Source materials
  • Hire contractors
  • Create timeline

Phase 3: Renovation Work (Variable)

Depending on scope:

  • Structural work first
  • Plumbing/electrical updates
  • Flooring/walls
  • Painting
  • Fixtures
  • Cleanup

Phase 4: Final Inspection

  • Quality checks
  • Defect identification
  • Rectification
  • Final cleaning
  • Handover

Renovation Package Examples

🏠 Light Renovation (₨ 500,000 – ₨ 1,000,000)

Time: 1-2 months

  • Painting (interior)
  • Minor flooring repairs
  • Bathroom updates
  • Kitchen accessories
  • Lighting upgrades
  • Basic landscaping

🏠 Standard Renovation (₨ 1,000,000 – ₨ 2,500,000)

Time: 2-4 months

  • Full interior makeover
  • Complete bathroom renovation
  • Kitchen modernization
  • New flooring throughout
  • Updated electrical
  • New fixtures

🏠 Major Renovation (₨ 2,500,000 – ₨ 6,000,000+)

Time: 4-8 months

  • Structural changes
  • Floor addition
  • Complete interior overhaul
  • New plumbing
  • Modern fixtures
  • Landscaping

🏠 Custom Renovation (Quote Required)

Time: Variable

  • Major structural changes
  • Multiple floor additions
  • Heritage restoration
  • Smart home integration
  • Complete redesign

What’s Included in Renovation Service

Professional Assessment

  • Structural inspection
  • Cost analysis
  • Feasibility report
  • Improvement recommendations

Design & Planning

  • Architectural drawings
  • 3D visualizations
  • Permit applications
  • Timeline creation

Project Management

  • Daily supervision
  • Quality control
  • Cost tracking
  • Issue resolution

Quality Materials

  • Verified suppliers
  • Bulk purchasing
  • Brand assurance
  • Local availability

Communication

  • Weekly progress reports
  • Photo & video updates
  • Cost transparency
  • WhatsApp support

Documentation

  • All work documented
  • Material receipts
  • Quality certificates
  • Final handover docs

Renovation FAQs

Should I renovate or build new?

Generally, renovate if the foundation and structure are sound. Build new if foundation has issues or you want completely different layout. We help you decide with our assessment.

Can I live in the house during renovation?

Depends on scope. Minor renovations: yes. Major renovations: usually no. We can plan to renovate in sections so you can stay in part of the house.

How long does renovation take?

1-2 months for minor, 2-4 months for standard, 4-8 months for major. Always longer than expected due to weather and contractor schedules.

Do I need permits for renovation?

Yes, for major work like:
Adding rooms
Structural changes
Building additions
Changing roof
Major electrical work Minor work (painting, flooring) usually doesn’t need permits.

What if hidden issues are found during renovation?

We pre-inspect, but sometimes issues are discovered (water damage, wiring problems). We immediately notify you, get quotes, and proceed only after your approval. We don’t surprise you with extra charges.

Also Check Out Our Other Services